The construction of the Seaway in 1957 called for new and unprecedented work. An entrance channel had to be excavated. In addition, the southern section of the bridge had to be raised to allow ships to pass underneath. At the same time, the unused streetcar tracks were removed and, in June 1956, a fourth lane was opened to vehicular traffic on the west side of the bridge.